Sunday, April 27, 2008

Home PICS Week 07

After the extremely fast progress of the last past weeks (on the oustide of the house), they are now working on the inside and the roof.

The house is 78 feet long (+/- 25 meter)

The house is 55 feet wide (16 meter). At the lake side there is no wall between the outer left and outer right wall. It is 1 space that is 16 meters wide, just like we wanted it.


This lovely lady was present at our lot when I took the pics. I wonder if she is included in the sales price.
The garages...

They are working on the roof right now. I expect they will install the tiles in the coming 2 weeks.

Our windows are tinted, dual glazed and lowE.

This is going to be a nice entrance.
Inside the house. Plumbing, electrical, etc...

2 comments:

Anonymous said...

Whaw, the 16-meter wall-free space with the lake view is gonna be superb!!! How 'deep' will this space be on the inside? Next time can you make a picture from the outside, i'm curious to understand how the constructor will attach a 16-meter 'window' without any supporting wall? I have seen similar constructions over here where they attach the 'window wall' to the roof, but they never manage to do that over 16 meter (or, if they do, the window wall is split in several parts)? Anyway, looks very impressive already!!!

RamsesVI said...

There will not be a 16 long window :-) There is no wall in between the outer walls at the lake side. So it has a loft"y" feeling.