Saturday, June 28, 2008

Update Home pics

3 weeks before it is finished.
They are preparing to pour concrete for the driveways.

This is a picture of the 1st floor (ceramic tile, put diagonally, with 4 inch granite in between them). I had to take this picture from our yard, because they have locked the door. This is a 2000 sq ft tiled surface. It took them 2 weeks and there are no groutlines yet.

No comments: